October 28, 2024
Sep-Oct aerial update: You’ll love what’s coming
Aerial update captures emerging elements that will transform Lakeside Village into a scenic destination The September/October 2024 aerial update shows future attractions springing up in Lakeside Village, from the Villas...
December 20, 2022
Dirt is flying on 3111 Sunset, major step for Lakeside Village
Construction on a 16-story luxury residential tower called 3111 Sunset Boulevard has begun in the southern end of Lakeside Village. Just in time for Christmas. The project represents the first...
August 2, 2016
Lakeside Parkway Phase II reconstruction to begin Saturday, August 6
Construction on Lakeside Parkway between the northern and central roundabouts will begin on Saturday, August 6, and is expected to last nearly a year. Construction begins...
October 14, 2013
Construction update for week of Oct. 14
Lots of work remains prior to the projected Nov. 1 opening of the roads in the single-family residential section of Lakeside DFW Phase I, said Scot Whitwer, construction manager. Residents...
August 12, 2013
August 12 construction update: Road closure
A portion of the recently renamed Northwood Drive will be closed for several months. The section of road, formerly known as Long Prairie, lies just south of Lakeside Parkway.
July 18, 2013
NBC 5 features Lakeside DFW
As construction began on the corner of International Parkway (FM 2499) and Lakeside Parkway, Brian Scott of NBC 5 News was there to cover it. The story (at left) aired...
April 9, 2013
Dirt is moving at Lakeside, excitement builds
A view north along Surrey Lane from Lakeside Parkway show trees being cleared as the dirt begins to fly at Lakeside DFW. Nearly 100 live oaks will be transplanted during...